Scholarly record
RISK MANAGEMENT IN ENGINEERING ACTIVITIES - MATRIX METHOD AND MULTI-CRITERIA ANALYSIS
Abstract
Engineering activity is charged with a very high risk. The engineering and construction activity is connected with a number of tasks, both planning and design as well as execution and maintenance of facilities already in use. At each stage of investment process operation they depend on a number of external and internal factors. They have a large impact on the success or failure of the investment project. When preparing the project, it is necessary to analyze the accompanying conditions. Recognizing possible threats allows you to take preventive measures and avoid losses that may be a consequence of risk. The main goal of the article is to show how important it is to carry out the identification and assessment of risks accompanying engineering activities, and to show how it can be done. In this type of analysis, matrix methods are usually used to assess the level of risk as low, medium, acceptable or high as well as the potential effects of the analyzed adverse phenomena. The methods are based on a descriptive scale developed each time individually for the analyzed projects. In the article, the threat for the exemplary investment was analyzed using the matrix method, and then the results of the study were compared with the analysis carried out using the multi-criteria analysis method. The application of multi-criteria analysis required the definition of a number of criteria for risk assessment and the assessment of their validity by experts. The advantages and disadvantages of both procedures have been described, showing that both procedures can be useful in different situations. The main conclusion from the conducted analysis is the statement that the most important is the awareness of threats and their analysis before proceeding with implementation, which allows to take effective preventive actions.
Publication Impact Profile
Publication details
References10
Akintoye A. S., MacLeod M. J. Risk analysis and management in construction, International Journal of Project Management, vol. 15 issue 1, (1997). pp. 31- 38.
Dziadosz A., Tomczyk A., Kapliński O. Financial risk estimation in construction contracts, Procedia Engineering, 122 (2015) pp. 120-128.
Kapliński O. Risk analysis of construction projects: From risk identification to contingency timetable. SEMC 2010: In Fourth International Conference on Structural Engineering, Mechanics and Computation, Cape Town, South Africa 2010. [w] A. Zingoni (Ed.), Advances and Trends in Structural Engineering, Mechanics and Computation, CRS Press Balkema, Taylor & Francis Group, London 2010.
Kapliński O. Risk Management of Construction Works by Means of the Utility Theory: a Case Study. Procedia Engineering. 57/2013 pp. 533-539.
Kuchta D., Skorupka D. Project risk management taking into consideration the influence of various risk levels based on linguistic approach. World Scientific Proc. Series on Computer Engineering and Information Science 7; Uncertainty Modeling in Knowledge Engineering and Decision Making - Proceedings of the 10th International FLINS Conf 7, (2012), pp. 1093-1098.
Skorupka D. Identification and initial risk assessment of construction projects in Poland, Journal of Management in Engineering, vol. 24 issue 3. (2008), pp.120-127.
Słomka A. Occupational risk in construction. PIP, GIP, Warszawa 2005.
Szafranko E. Comparative analysis of methods for estimating the level of risk in construction, Logistics 5(2014), pp. 1498- 1507.
Szafranko, E. Applicability of the indicator method to evaluation of road building projects. News in Engineering, 1/2015, pp. 1-7.
Zavadskas E.K., Turskis Z.,Tamošaitiene J. Risk assessment of construction projects, Journal of Civil Engineering and Management, vol. 16, issue 1, (2010), pp. 33-46
View or Download full articleAccess options
SWS access login
Login as SWS Scientific CommitteeLogin as SWS Scientific PartnerLogin as SWS AuthorAuthors and approved SWS contributors will read and export their own linked papers after identity matching by SWS profile, email and SGEM GlobalID.
For librarian assistance: [email protected]
Purchase Instant Access
- Article can be downloaded after successful payment.
- Article may be used according to SWS library access terms.
- Article cannot be redistributed.



